December 2013 to March 2014 and June 2014 to August 2014 >>
This project was carried out in two phases, according to the client’s instructions. Tersus handled the following two phases of work:
- Paved a 3 km long dual carriageway road
- Manufactured, delivered, and installed over 450 metres of 1×1 m precast drain channels for flood control