Lagos Homs, Igando, Lagos

September 2012 to September 2014 >> The entire road and drain infrastructure for a residential estate project was awarded to Plycon Limited. Due to our partnership with Plycon, Tersus was the project manager. Tersus performed these responsibilities: Produced and installed various sizes of precast drains Built all layers of the roads within the estate; from…

Ayobo, Lagos

December 2013 to March 2014 and June 2014 to August 2014 >>    This project was carried out in two phases, according to the client’s instructions. Tersus handled the following two phases of work:   Paved a 3 km long dual carriageway road Manufactured, delivered, and installed over 450 metres of 1×1 m precast drain…

Akanbi Arimi & Onikoyi Aguda, Surulere, Lagos

April 2014 to August 2014 These are 250-meter road construction projects. Tersus effected a complete overhaul and reconstruction of these roads, including drainage. The roads were built to international standards, using paving stones. Here are some of the steps involved:   Created a very stable sub-grade by replacing soil where required Stabilized the sub-grade using…

STEEL FABRICATION

At Tersus, we have the expertise and equipment required to fabricate steel structures. Our welders and engineers use the best tools and equipment to achieve a high degree of accuracy in our products. Tersus’ goal is to fabricate with accuracy to the nearest centimetre, and we achieve this by using laser technology.